The groundbreaking ceremony at Visonta Project which will be the Hungary’s largest grain processing plant was occured with the concrete produced in the ELKON Mobile Master-60 Pegasus mobile concrete batching plant and Hungary’s economy minister also took place in the ceremony. The investment of nearly 30 billion HUF gives employment to more than 250 people, and indirectly provides more than 500 people livelihoods in the region. In the project planned to be completed in May 2018, the waste gases comes from the Matra Thermal Power Plant will be utilized.
ELKON Mobile Master-60 Pegasus mobile concrete batching plant which used for the production of required concrete in the project has the production capacity of 50 m³/h vibrated concrete with the 1500/1000 l pan mixer. The 4×13,5 m³ square type aggregate storage, which allows to store 4 different aggregates is located in the main unit of mobile concrete plant equipped with wheels and axle. This concrete batching plant which has been pre-installed by ELKON factories can be set up in just one day to be ready for production of concrete.